|
The Anderson River Power Project is a proposed multi-intake, non-storage hydro project located 100 km from the Lower Fraser Valley. The respective intakes are located at elevations of 545 m (Anderson), 640 m (East Anderson) and 780 m (Uztlius) and discharge to a common powerhouse at the confluence of the three flows at 300 m. In total the project will require 13,337 m of penstock leading to 3 x 10MW Vertical Axis Pelton generators.

|