Chilliwack Valley Cluster

  Chilliwack Valley Cluster

Max Pacific Power Inc. is currently developing three projects in the Chilliwack Valley, southeast of Chilliwack in the Fraser Valley. The three project areas - Chipmunk Creek, Airplane Creek, and Foley Creek - are located immediately south of the existing BC Hydro generating station at Wahleach, which generates approximately 27MW from a high elevation lake with a drainage basin abutting the drainage basins for the Chipmunk, Airplane, and Foley Creeks